[ _ ] Reduce material waste through reuse design
[ _ ] Increase constructability of a complex building system
[ _ ] Decrease language barriers and increase safety concerns
Description:
A process in which 3D System Design Software is utilized to design and analyze the construction of a complex building system (i.e. form work, glazing, tie-backs, etc.) in order to increase planning.
Potential Benefits:
decrease language barriers between superintendent and crew
increase construction productivity
increase safety awareness of a complex building system
Levels of Detail Considerations:
Team Competencies Required:
Characteristics in order to substantiate BIM use:
Project - complex building systems
Organization -
Environment -
Contract -
Process -
Goal: 3D System Design
Status of Use Document: Early DraftPhase(s): Construction
Objective:
[ _ ] Reduce material waste through reuse design
[ _ ] Increase constructability of a complex building system
[ _ ] Decrease language barriers and increase safety concerns
Description:
A process in which 3D System Design Software is utilized to design and analyze the construction of a complex building system (i.e. form work, glazing, tie-backs, etc.) in order to increase planning.Potential Benefits:
Levels of Detail Considerations:
Team Competencies Required:
Characteristics in order to substantiate BIM use:
Project - complex building systemsOrganization -
Environment -
Contract -
Process -
Potential Modeling Methods:
Potential Outputs:
Legal / Commitment Considerations:
Additional Resources:
General Description:
Quantitative Studies:
Case Study Examples:
Software Applications:
3rd Party Vendors: